11 points ·
No, weaker. It's an overclocked 7600M (laptop GPU). There's many leaks that show that Valve specifically targeted a low cost by using laptop components that AMD couldn't sell.
The CPU is also weak: it has 2 big cores and 4 little cores. Estimated cost of materials (before the RAM shortage) was ~425 USD, now the cost of materials is ~550 USD